Overview
As of February 5, 2026, Suffield Township has assumed full responsibility for all Right-of-Way Work Permits on Township roads.
All permits related to work within Township road right-of-ways must be obtained directly through Suffield Township.
Permit Authority
Suffield Township is the issuing authority for Right-of-Way Work Permits on Township roads.
This includes permits for:
- Work within Township road right-of-ways
- Construction or excavation affecting Township roads
- Utility work within Township right-of-ways
- Any work that may impact Township road access or conditions
The Portage County Engineer’s Office will no longer issue Right-of-Way Work Permits for Suffield Township roads.
Permit Contact
All Right-of-Way permit requests should be directed to:
Dave EinlothSuffield Township Right-of-Way Permits
Phone: 330-628-4974
Email: [email protected]
Application Requirements
Applicants should be prepared to provide the following information:
- Project location
- Description and scope of work
- Proposed start and completion dates
- Traffic control plan, if applicable
- Proof of insurance
- Contractor/Home Owner contact information
Important Notice
No work may begin within a Township right-of-way without an approved Right-of-Way Work Permit from Suffield Township.
Failure to obtain proper authorization may result in work stoppage, penalties, or required restoration at the contractor or home owner’s expense.
Questions
For questions about Right-of-Way Work Permits, application requirements, or Township road work, please contact Suffield Township using the permit contact information listed above.